Planned electrical maintenance means finding faults on a schedule, before they become an outage, a fire or an insurance dispute. Most electrical faults in commercial buildings do not appear without warning. A connection loosens, a protective device ages, a circuit slowly takes on more load than it was built for.
What is a planned electrical maintenance contract?
A planned preventative maintenance contract sets out a programme of regular electrical inspections and tests for your premises, carried out by the same contractor over a fixed term. Instead of calling an electrician after something fails, you agree a schedule in advance and the contractor works through it.
What a good contract covers
- Periodic inspection and testing. EICRs on the correct cycle for your premises, with remedial works prioritised by code.
- Distribution board checks. Visual inspection, tightness checks and operation of protective devices.
- RCD testing. Regular operation tests to confirm devices trip when they should.
- Emergency lighting tests. Routine function checks and the annual full-duration test under BS 5266, with a logbook kept up to date.
- Thermal imaging. Scans of boards and switchgear under load to find hot connections. See our thermal imaging survey guide.
- Portable appliance testing, where it forms part of your compliance routine. See PAT testing vs EICR.
- Reporting. A written record of every visit, finding and action.
Why it pays for itself
Fewer breakdowns. Faults found during a scheduled visit are fixed on your terms, at a time that suits your operation, not in the middle of a production shift.
Evidence of compliance. A documented maintenance history is the clearest way to show insurers, landlords and enforcing authorities that you are meeting your duty to maintain the installation.
Predictable budgets. Planned work can be costed and scheduled in advance. Reactive callouts rarely can.
Longer equipment life. Properly maintained boards and cabling last longer and perform better under load.
What to ask before you sign
- What exactly is included in each visit, and how often?
- What are the response times if something goes wrong between visits?
- Who carries out remedial works, and how are they priced?
- How are results reported, and in what format?
- Are the engineers from a NICEIC Approved Contractor, with the right qualifications?
- What is the contract term and the notice period?
Start with a survey
A sensible programme is built around the actual installation. That starts with a site survey and, usually, a baseline EICR, so the schedule reflects the age, condition and use of your building rather than a generic template.
Common questions
How often should planned electrical maintenance visits happen? It depends on the site. A survey and baseline EICR usually show what is needed, and critical sites typically add annual checks such as thermal imaging.
Is planned maintenance different from an EICR? Yes. An EICR is a periodic inspection of the whole installation. A maintenance programme includes it, plus regular checks, tests and records between inspections.
Related guides
- EICR for commercial property: a facilities manager's guide
- Thermal imaging survey: find electrical faults early
- HSE: electrical safety at work
- NICEIC: find a registered contractor
Bowers Contracting is NICEIC Approved and works with commercial and industrial clients across Milton Keynes, Northampton, Bedford and the surrounding area. We build planned electrical maintenance programmes around each site.
Call 01908 040 294 or email mike@bowerscontracting.co.uk to discuss a planned maintenance programme for your premises.